Path: Transactions > CPPM Lookups > Sources
Work Elements have various sources. These sources can include Facility Condition Audits, Contracted Engineering Studies, Internal Inspections, or a walk-through inspection of a building. Use this Lookup to formalize the possible sources of a Work Element. The CP Source Lookup is applied to a Work Element on the Capital Planning > Work Elements / Identity–Additional Info Subtab.
Sample Data: