How to Add Meter Readings
Path: Organization > Equipment > Records / Meter Tab
After you have added a meter to a record, you can use the Add Reading link on each meter line item to update the meter when a new reading is taken.
From Meter Tab of the desired equipment record:
- Click Edit on the WebTMA toolbar.
- Click the + sign adjacent to the desired meter line.
- Click the Add Reading link on the sublist.
- Complete the required fields: Reading, Reading Date, and Taken By.
- (Optional) Click the Rollover check box if the meter has exceeded the number of digits designated when you added the meter record.
- Click the Save button on the popup.
- Click Save on the WebTMA toolbar.